Tel:
China Wind Turbine Generator System manufacturer
Guangzhou HY Energy Technology Limited Corp.

HY Energy-Engineer To Build A Cleaner World

Home ProductsHome Wind Turbine System

High Power Production House Mounted Wind Turbine 1000 Watt With Hydraulic Tower

High Power Production House Mounted Wind Turbine 1000 Watt With Hydraulic Tower

High Power Production House Mounted Wind Turbine 1000 Watt With Hydraulic Tower

Product Details:

Place of Origin: Guangzhou,China
Brand Name: HYE
Certification: CE, ISO9001, RoHs
Model Number: HY-1000

Payment & Shipping Terms:

Minimum Order Quantity: 1pc
Price: Negotiable
Packaging Details: standard export packing
Delivery Time: 3-5days
Payment Terms: D/A, L/C, D/P, T/T, Western Union, MoneyGram
Supply Ability: 3000sets/month
Contact Now
Detailed Product Description
Rated Output: 1000w Start Up Speed: 2m/s
Rated Voltage: DC 24v / 48v Number Of Blades: 3 / 5
Rotor Diameter: 1.96 Net Weight: 28kgs
Tower Connection: Flange Connection Or Reducting Joint Warranty: 3years

 

High Power Production 1000 Watt Home Wind Turbine System With Hydraulic Tower

 

 

HY-Energy wind turbine special features:

 

· CE certified for "Small Wind Turbine with High Reliability".

· 5 blade designed for low wind area, light breeze start up

· Amazingly quiet operation with minimal vibration.

· Long lifetime, free of maintenance

· Fully automatic with blade aerodynamic braking and controller electromagnetic braking.

· High efficiency is achieved by matching design of the generator and blades perfectly.

· Patented Blades with twisted aerodynamic design made with strengthened Nylon-fiberglass material

· Anti-rust & anticorrosion

· Light weight, easy installation, no welding needed. Pole connector provided with bolt-on clamp or flange

 

Specifications of HY-1000 wind turbine:

 

Model HY-1000
Rated Power 1000W
Max. Power 1200W
Rated Voltage 24Vdc 48Vdc 110Vdc 180Vdc
Rated rotation speed 750rpm
Start-up Wind Speed 2.0m/s
Cut-in Wind Speed 2.5m/s
Rated Wind Speed 12m/s
Survival Wind Speed 50m/s
Rotor Diameter 1.96m
Blades Quantity 5
Swept area 3.01m²
Noise Level <20 dB (5m behind turbine @5m/s gusting)
Generator Type Three phase PMA
Wind Turbine Type Upwind
Tower connection Flange connection or bolt-on clamp
Temperature -40°C~60°C
Strong wind protection mode electromagnetic brake, blades aerodynamic brake
Service life 15 years
Net weight 28kg
Gross weight 32kg
Package size 146×53×27cm

 

Applications

 

Wind on grid / grid tied system for electricity reduction or FIT

Wind and solar hybrid off grid home system

Wind and solar hybrid street lights system

Wind and solar hybrid CCTV system

Wind and solar hybrid telecommunication station system

 

Honors

 

National- authenticated high-tech enterprise

AAA-level Standardization Good Compliance company in Guangdong province

Membership of World Wind Energy Association & Only Chinese Company listed into WWEA quality product catalog for eight consecutive years

Vice Executive Director of National Wind power equipment Association

Membership of National solar association

Main drafter for National Standard of Off-grid wind solar hybrid systems and take part in the edit of international standard

Undertakes Wind turbine R&D project of China’s12th five-year plan

35 technical patents

 

Wind turbine installation siting

 

An ideal location for wind generator is required with stable speed and direction of prevailing wind. Small changes in wind speed and direction can have a dramatic effect on power production. In general, the higher the tower, the greater the wind speed and ultimately power production are. Therefore, the site of your wind turbine should be carefully considered. Each installation is different and is often compromised among the tower height, distance from the battery bank, local zoning requirements and obstacles such as buildings and trees. Following requirements should be followed:

  • The minimum recommended tower height is 20 ft (6 m) on open ground or 20 ft (6 m) above nearby obstructions
  • Try to locate the wind turbine in the “cleanest” turbulent free air as possible. Turbulence will reduce the efficiency of wind turbine and may accelerate wear on rotating components.
  • Try to locate the turbine without obstacles within 200m of installation center.
  • The installation distance between two turbines should be 8-10 times of the rotor diameter.
  • Installation site should be complied with local regulations.

 

 

Contact Details
Guangzhou HY Energy Technology Limited Corp.

Contact Person: Tina Tang

Send your inquiry directly to us (0 / 3000)

Guangzhou HY Energy Technology Limited Corp.
5th &7th Floor,Tiangui Building B Tower,No.62 Tiangui Road,Huadu District,Guangzhou,China
Tel:86-20-36888000-8010
Mobile Site Privacy Policy China Good Quality Wind Turbine Generator System Supplier. Copyright © 2017 - 2020 windturbinegeneratorsystem.com. All Rights Reserved. Developed by ECER